fix(services): align hero_voice/whiteboard/osis admin sockets to admin.sock #242

Merged
mik-tf merged 1 commit from development_mik_admin_sock_align into development 2026-05-09 11:59:59 +00:00
Owner

s76 audit reported nutools fully aligned to admin.sock, but voice/whiteboard/osis still referenced /web.sock — both for the admin process spec (socket:) and the openrpc health-check probe. Caused post-rename binaries (admin.sock per producer Phase 1 PRs) to be reported unhealthy by hero_proc. Pairs with hero_voice/whiteboard/osis Phase 1 PRs. hero_proxy was already on admin.sock; no change needed. Tracked under lhumina_code/home#230 Phase 1.

s76 audit reported nutools fully aligned to admin.sock, but voice/whiteboard/osis still referenced /web.sock — both for the admin process spec (socket:) and the openrpc health-check probe. Caused post-rename binaries (admin.sock per producer Phase 1 PRs) to be reported unhealthy by hero_proc. Pairs with hero_voice/whiteboard/osis Phase 1 PRs. hero_proxy was already on admin.sock; no change needed. Tracked under https://forge.ourworld.tf/lhumina_code/home/issues/230 Phase 1.
fix(services): align hero_voice/whiteboard/osis admin sockets to admin.sock
Some checks failed
Build and Publish Skills / build-and-publish (pull_request) Failing after 2s
1478537261
s76 audit had reported nutools as fully aligned to admin.sock, but the
voice/whiteboard/osis files still referenced /web.sock — both for the
admin process spec (`socket:`) and for the openrpc health-check probe.
This caused the post-rename binaries (now wired to admin.sock by their
producer-side rename PRs) to be reported unhealthy by hero_proc despite
running fine.

Pairs with the four producer-side Phase 1 PRs:
- hero_voice  (development_mik_ui_to_admin)
- hero_whiteboard (development_mik_ui_to_admin)
- hero_osis (development_mik_ui_to_admin)

hero_proxy was already on admin.sock; no change needed there.

Tracked under: lhumina_code/home#230 Phase 1

Signed-off-by: mik-tf
mik-tf merged commit f75e58a911 into development 2026-05-09 11:59:59 +00:00
mik-tf deleted branch development_mik_admin_sock_align 2026-05-09 11:59:59 +00:00
Sign in to join this conversation.
No reviewers
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
lhumina_code/hero_skills!242
No description provided.