fix(proc_ui): silence iframe console errors #72

Merged
zaelgohary merged 1 commit from development_fix_proc_ui_proxy_paths into development 2026-04-29 10:15:45 +00:00
Member

Summary

Proc admin island spammed two errors per load when opened in hero_os. This silences both.

Closes #73

Changes

  • Skipped the localhost:9998 inspector probe in iframe contexts
  • Dropped the corrupt + redundant hljs-toml script (hljs-ini already registers the TOML alias)
  • Removed the broken hero-bootstrap-bridge.css link

Test Results

playwright trace on proc open: 0 page errors, 0 failed asset loads.

## Summary Proc admin island spammed two errors per load when opened in hero_os. This silences both. ## Related Issue Closes https://forge.ourworld.tf/lhumina_code/hero_proc/issues/73 ## Changes - Skipped the localhost:9998 inspector probe in iframe contexts - Dropped the corrupt + redundant hljs-toml script (hljs-ini already registers the TOML alias) - Removed the broken hero-bootstrap-bridge.css link ## Test Results playwright trace on proc open: 0 page errors, 0 failed asset loads.
fix(proc_ui): resolve embedded-island errors (bridge.css path, iframe inspector probe, drop corrupt hljs-toml)
Some checks failed
Tests / test (pull_request) Failing after 2m52s
Build and Test / build (pull_request) Failing after 3m34s
13f083e512
zaelgohary force-pushed development_fix_proc_ui_proxy_paths from 13f083e512
Some checks failed
Tests / test (pull_request) Failing after 2m52s
Build and Test / build (pull_request) Failing after 3m34s
to b38d90a87c
Some checks failed
Tests / test (pull_request) Failing after 2m7s
Build and Test / build (pull_request) Failing after 2m31s
2026-04-29 10:03:15 +00:00
Compare
zaelgohary changed title from fix(proc_ui): resolve embedded-island errors to fix(proc_ui): silence iframe console errors 2026-04-29 10:03:41 +00:00
zaelgohary merged commit 744780040e into development 2026-04-29 10:15:45 +00:00
zaelgohary deleted branch development_fix_proc_ui_proxy_paths 2026-04-29 10:15:46 +00:00
Sign in to join this conversation.
No reviewers
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
lhumina_code/hero_proc!72
No description provided.