docs(e2e_checklist): audit-log entry for first post-D-26 router-fronted walkthrough #19

Merged
mik-tf merged 1 commit from development_mik into development 2026-05-23 12:24:36 +00:00
Owner

Captures today's Rule-6 walkthrough against the Askama + Unpoly + SSE stack. Customer UI at /hero_assistance/app/ works end-to-end (enrol, list, ticket detail, D-27 SSE wire shape and 401 auth gate). Operator admin at /hero_assistance/admin/ loads 8 tabs with Users, Projects, Stats working and Tickets, Comments, Admin, Logs, Docs each surfacing a known follow-up.

Diagnose-and-route comments posted today on all 4 open follow-up issues plus a cross-track convergence note on hero_router#110. Customer-readiness gate tracker #18 filed today subsumes the 4 follow-ups plus the post-D-26 checklist rewrite as v1.0 blockers.

No source-code touches; doc-only.

Captures today's Rule-6 walkthrough against the Askama + Unpoly + SSE stack. Customer UI at `/hero_assistance/app/` works end-to-end (enrol, list, ticket detail, D-27 SSE wire shape and 401 auth gate). Operator admin at `/hero_assistance/admin/` loads 8 tabs with Users, Projects, Stats working and Tickets, Comments, Admin, Logs, Docs each surfacing a known follow-up. Diagnose-and-route comments posted today on all 4 open follow-up issues plus a cross-track convergence note on hero_router#110. Customer-readiness gate tracker #18 filed today subsumes the 4 follow-ups plus the post-D-26 checklist rewrite as v1.0 blockers. No source-code touches; doc-only.
Captures today's Rule-6 walkthrough against the Askama + Unpoly + SSE
stack: customer UI at /hero_assistance/app/ works end-to-end (enrol,
list, ticket detail, D-27 SSE wire shape and 401 auth gate); operator
admin at /hero_assistance/admin/ loads 8 tabs with Users, Projects,
Stats working and Tickets, Comments, Admin, Logs, Docs each surfacing
a known follow-up.

Diagnose-and-route comments posted today on all 4 open follow-up
issues plus a cross-track convergence note on hero_router#110
(rediscovered from this side at the prior session close, fixed in
hero_router earlier today).

No cell flips in Sections A through D this session: the row bodies
still cite Dioxus-era source files and need a body rewrite against
the new Askama + Unpoly + SSE shape before per-cell stamps are
meaningful. Customer-readiness gate tracker
#18
filed today subsumes the 4 follow-ups plus the checklist rewrite as
v1.0 blockers.

Refs:
- #16
- #18
- lhumina_code/hero_router#109
- lhumina_code/hero_router#110
- lhumina_code/hero_website_framework#7
- lhumina_code/hero_website_framework#8

Signed-by: mik-tf <mik-tf@noreply.invalid>
mik-tf merged commit f22d819370 into development 2026-05-23 12:24:36 +00:00
mik-tf deleted branch development_mik 2026-05-23 12:24:36 +00:00
Sign in to join this conversation.
No reviewers
No labels
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
lhumina_code/hero_assistance!19
No description provided.